Malawi Broadcasting Corporation
Development Local Local News

SRWB needs K500 million to address flood induced challenge

Southern Region Water Board (SRWB) is in need of half a billion kwacha to maintain its pumping system at Liwonde barrage, owing to rising water levels in Shire River.

Board chairperson of SRWB disclosed this during a visit by the Parliamentary Committee on Natural Resources and Climate Change.

The high waters have submerged some of their pumping equipment, resulting in the need to adjust or relocate.

The committee’s chairperson Welani Chilenga has given assurance that they will lobby finance authorities to assist SRWB.

 

Related posts

Salima joins golden boot race

Romeo Umali

Man arrested after electrocution attempt in Limbe

Alinafe Mlamba

Matola condemns vandalism of power line

Mayeso Chikhadzula
error: All Content is protected. Copyright © 2022. Malawi Broadcasting Corporation. All Right Reserved.